RAD restriction ED3758

Explain
Candidate screen (advisory)
Search Results (2 found)
RAD V1.6
(Annex 2B) Local and Cross-border Capacity and Structural Rules (2 found)

ED2699(L608)

RAD Code

ED2699

Valid From

29 JUL 2025 [2507]

Valid Until

UFN

Airway Code

L608

From

ERKIR

To

KOGOL

Time Applicability

00:00-23:59

Categorisation

S

Utilization
NOT AVBL FOR TFC
1.VIA (KOGOL M726 KONIN)
2.ARR (EDDM, EDMA, EDMO, EDDS)
3.ARR (LSZH, LSMD) & ABV FL315 AT ERKIR
Operational Goal
1.To avoid turns
2.Segregation of arrivals
3.to allow only listed ARR with non-standard early descend via ATS route (standard ARR with high transfer shall use ERKIR DCT KPT - see ED51478 and ED3758)
ATC Unit

(EDMMACC, EDUUUAC)

NAS/FAB

ED

Release Date

28 JUL 2025

ED3758

RAD Code

ED3758

Valid From

26 AUG 2025 [2508]

Valid Until

UFN

Point or Airspace

EDUUUTA

Time Applicability

00:00-23:59

Categorisation

S

Utilization
NOT AVBL FOR TFC
1.ARR (LSZH, LSMD) EXC
a.VIA (KOMOB, RITAX, PITES, LIRSU) AND-THEN VIA (LAMGO T721 RILAX)
b.VIA (TUSUK DCT LAMGO T721 RILAX)
c.VIA (ULNOK, TUSUK) AND-THEN VIA (SUNEG T721 RILAX)
d.VIA (DODEN, TESGA, KUMIK, GISEM) AND-THEN VIA (BOMBI T721 RILAX)
e.VIA (DODEN DCT TABUM DCT OMOGI T721 RILAX)
f.VIA (SWALM DCT OMOGI T721 RILAX)
g.VIA (EDMMBBG, EDUUERL1R) AND-THEN VIA (AMOSA N869 TEDGO T724 RILAX)
h.VIA (TRAUN DCT KONIN L856 RAVED)
i.VIA (ERKIR DCT KPT L856 RAVED)
j.VIA (SOTOV, UNIMI) AND-THEN VIA (MOGTI P66 KPT L856 RAVED)
Operational Goal
Connecting Routes to / from KUAC
To force traffic via dedicated routes/points allowing transition to / from upper airspace.
For DCTs EDUUFRAW refers (H24, MIN FL245), for option 1. h. EDUUFRAE (MIN FL315) and for option 1. i. RAD ANNEX 3B (ERKIR-KPT, MIN FL245) . Route option 1. h. and 1. i. (using DCTs) trigger high transfer LOVVACC to EDUUUAC. Traffic with non-standard early descend below EDUUUAC (RFL below FL315 at ERKIR or TRAUN) shall use TRAUN L856 RAVED or ERKIR L608 KPT and will be transferred from LOVVACC to EDMMACC.
ATC Unit

(EDUUUAC, EDGGACC, EDMMACC)

NAS/FAB

ED

Release Date

25 AUG 2025

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙