RAD restriction EDYX1175

Explain
Candidate screen (advisory)
Search Results (2 found)
RAD V1.6
(Annex 2B) Local and Cross-border Capacity and Structural Rules (2 found)

ED2578

RAD Code

ED2578

Valid From

2604 [16 APR 2026]

Valid Until

UFN

Point or Airspace

DODEN

Time Applicability

00:00-23:59

Categorisation

S

Utilization
NOT AVBL FOR TFC
1.ABV FL245 AT DODEN EXC
a.VIA (DODEN Y852 TUSUK)
b.VIA (DODEN Y853 BOMBI)
c.VIA (DODEN DCT TABUM) AND-THEN VIA (FOLWU, GIGET, HAREM, OMOGI)
d.VIA (DODEN DCT NEGIX DCT DINKU)
Operational Goal
Free Route Flow restriction to allow only a certain route options via this FRA point respecting LoA conditions.
For DCTs H24 EDUUFRAW above FL245 refers.
Note, x-FRA DCTs via Gate EDGTTIVUN to DODEN are possible, see also RAD EDYX1175.
ATC Unit

EDUUUAC

NAS/FAB

ED

Release Date

06 MAR 2026

EDYX1175

RAD Code

EDYX1175

Valid From

2604 [16 APR 2026]

Valid Until

UFN

Point or Airspace

EDGTTIVUN

Time Applicability

H24 ---------- 05:00-23:00 (04:00-22:00)

Categorisation

S

Utilization
NOT AVBL FOR TFC
1.VIA EDYYHRHR AND-THEN VIA EDGTTIVUN
EXC
a.VIA (DODEN, TIVUN)
b.VIA (HEFME Z841 GMH)
c.VIA (ONUNE DCT GMH)
----------
NOT AVBL FOR TFC
1.VIA EDYYBUTA AND-THEN VIA EDGTTIVUN
2.VIA (EDYYHCEL, EDYYHSOL) AND-THEN VIA EDGTTIVUN
Operational Goal
Free Route Flow restriction via Gate to allow additional x-border FRA options and to ensure LoA conditions.
For segments downstream see the respective FRA Flow restrictions (for DODEN-ED2578, GMH-ED2283, TIVUN-ED2285).
------
To avoid unusual sector sequence.
1.Eastbound traffic via the Brussels sectors of Maastricht UAC shall file via MATUG, LIRSU or cross-border FRA options across gate EDGTLIRSU.
2.Southbound traffic via the Celle / Solling sector of Maastricht UAC shall file via XAROL, OTMON or cross-border FRA options across gate EDGTXAROL / EDGTOTMON.
ATC Unit

EDUUUAC, EDYYUAC

NAS/FAB

ED,YX

Release Date

06 MAR 2026

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙