RAD restriction EG5018

Explain
Candidate screen (advisory)
Search Results (7 found)
RAD V1.6
(Annex 3B DCT) En-route DCT Options (7 found)

EG5018(CALDA → KEPAD)

RAD Code

EG5018

Valid From

2303 [23 MAR 2023]

Valid Until

UFN

From

CALDA

To

KEPAD

Lower Vertical Limit

195

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
DEP EGPXFIR
With ARR EGHH/HI/HO/KK/TK, BRIZE_GROUP (except via (KARNO, MIDJO)), FARNBOROUGH_GROUP, JERSEY_GROUP (except via KARNO)
With RFL between FL195 and FL245
Via CALDA
----------
COMPULSORY FOR TFC
Compulsory for traffic
DEP EGPXFIR
With ARR EGHH/HI/HO/KK/TK, BRIZE_GROUP (except via (KARNO, MIDJO)), FARNBOROUGH_GROUP
With RFL between FL195 and 245
Via CALDA
Time Availability

H24 ---------- H24

Operational Goal
Positioning routes for LAC traffic orientatio
n.Link route to allow operators to plan to transition to L151 for the standard arrival route
ATC Unit

EG**ACC

Release Date

09 FEB 2023

EG50180(BUGUP → EVSEM)

RAD Code

EG50180

Valid From

BOT

Valid Until

UFN

From

BUGUP

To

EVSEM

Lower Vertical Limit

MEA

Upper Vertical Limit

660

Available or Not

Yes

Utilization
ONLY AVBL AND COMPULSORY FOR TFC
DEP EGTK
1.Via CPT/DET/DVR/GWC/KENET/MID/SAM/SFD/XIDIL
With RFL above FL195 in EGTTFIR
Time Availability

00:00-23:59

Operational Goal
To ensure traffic follows standard route
ATC Unit

EG**ACC

EG50185(KENET → MID)

RAD Code

EG50185

Valid From

BOT

Valid Until

UFN

From

KENET

To

MID

Lower Vertical Limit

155

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
1.ARR EGKR
2.DEP EGTK/UB
Time Availability

00:00-23:59

Operational Goal
DCT to link to airfields/airway structure
ATC Unit

EG**ACC

EG50186(KENET → SILVA)

RAD Code

EG50186

Valid From

2409 [05 SEP 2024]

Valid Until

UFN

From

KENET

To

SILVA

Lower Vertical Limit

065

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
1.ARR (EGKB, EGLC, EGMC, EGSC, EGSS, EGSU, EGSX, EGSR, EGUN, EGUL)
2.ARR EGGW ACFT-PBN (D1,D2,D3,D4,O1,O2,O3,O4)
----------
COMPULSORY FOR TFC
RFL BTN FL105-FL175 IN EG
DEP (EGGD, EGFF)
1.ARR (EGKB, EGLC, EGMC, EGSC, EGSS)
2.ARR EGGW ACFT-PDN (D1,D2,D3,D4,O1,O2,O3,O4)
----------
COMPULSORY FOR TFC
ARR (EGUN, EGUL) VIA NUCHU
AND RFL BLW FL175 IN EG
Time Availability

H24 ---------- H24 ---------- H24

Operational Goal
Structural - To prevent incorrect use of DCT and provide connectivity from NUCHU.
Non RNAV1 traffic to EGGW to join the DET2A STAR at LOFFO
-----------------------------------------------------------
To enforce correct routeing. EGGD/FF deps remaining below FL105 shall file CONKO DCT CPT to ensure they remain inside CAS.
ATC Unit

EG**ACC

Release Date

17 JUL 2024

EG50187(KUMIL → ABSAV)

RAD Code

EG50187

Valid From

2206 [16 JUN 2022]

Valid Until

UFN

From

KUMIL

To

ABSAV

Lower Vertical Limit

165

Upper Vertical Limit

660

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
1.ARR WESSEX_GROUP
2.ARR EGLF acft-eqpt NOT (D1, D2, D3, D4, O1, O2, O3, O4)
Time Availability

00:00-23:59

Operational Goal
DCT from airway structure to airfields (WESSEX_GROUP) AND EGLF ABSAV1P
ATC Unit

EG**ACC

Release Date

25 APR 2022

EG50188(CLN → LAM)

RAD Code

EG50188

Valid From

2512 [27 NOV 2025]

Valid Until

UFN

From

CLN

To

LAM

Lower Vertical Limit

MEA

Upper Vertical Limit

155

Available or Not

Yes

Utilization
COMPULSORY FOR TFC
1.DEP EGSH & BLW FL155 & ARR (EGLD, EGLL, EGWU)
2.DEP EGLC & ARR (EGLD, EGLL, EGWU)
3.DEP EGSS & ARR (EGLD, EGLL, EGWU)
Time Availability

00:00-23:59

Operational Goal
1.Link route for city pair / combined with BANEM DCT CLN.
2.To ensure positioning traffic follows standard routeing.
ATC Unit

EG**ACC

Release Date

17 OCT 2025

EG50189(ROBEM → RIVOT)

RAD Code

EG50189

Valid From

2604 [16 APR 2026]

Valid Until

UFN

From

ROBEM

To

RIVOT

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
DEP EGNT AND-THEN ARR (ENBR, ENZV) & RFL BLW FL245 IN EG
Time Availability

(EGD613D & EGD613DZ1 & EGD613DZ2 & EGD513A & EGD513AZ1 & EGD513AZ2 & EGD513B & EGD513BZ1 & EGD513BZ2 & EGD514 & EGD514Z1) NOT ACT

Operational Goal
To facilitate connections where there is no appropriate ATS route structur
e.Only available when none of the listed danger areas are active.
ATC Unit

EG**ACC

Release Date

11 MAR 2026

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙