RAD restriction EG5059

Explain
Candidate screen (advisory)
Search Results (11 found)
RAD V1.6
(Annex 3B DCT) En-route DCT Options (11 found)

EG5059(DCS → NATEB)

RAD Code

EG5059

Valid From

BOT

Valid Until

UFN

From

DCS

To

NATEB

Lower Vertical Limit

105

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
ARR EGNT
Time Availability

00:00-23:59

Operational Goal
There is no reasonable alternative route that can be flight planned.
ATC Unit

EG**ACC

EG50590(STN → MATIK)

RAD Code

EG50590

Valid From

BOT

Valid Until

UFN

From

STN

To

MATIK

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
There is no reasonable alternative route that can be flight planned.
ATC Unit

EG**ACC

EG50591(STN → NINEX)

RAD Code

EG50591

Valid From

BOT

Valid Until

UFN

From

STN

To

NINEX

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
There is no reasonable alternative route that can be flight planned.
ATC Unit

EG**ACC

EG50592(STN → RATSU)

RAD Code

EG50592

Valid From

BOT

Valid Until

UFN

From

STN

To

RATSU

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To allow traffic in the lower airspace to access RATSU from STN where no airway exists
ATC Unit

EG**ACC

EG50593(STOAT → EBOTO)

RAD Code

EG50593

Valid From

BOT

Valid Until

UFN

From

STOAT

To

EBOTO

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

No

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
Non-standard routing not permitted
ATC Unit

EG**ACC

EG50594(AGCAT → WIGGU)

RAD Code

EG50594

Valid From

2303 [23 MAR 2023]

Valid Until

UFN

From

AGCAT

To

WIGGU

Lower Vertical Limit

MEA

Upper Vertical Limit

195

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
Allowable DCT through uncontrolled airspac
e.AOs using this DCT should be prepared to accept a reduced service
ATC Unit

EG**ACC

Release Date

09 FEB 2023

EG50595(ADHAV → ABBEW)

RAD Code

EG50595

Valid From

2303 [23 MAR 2023]

Valid Until

UFN

From

ADHAV

To

ABBEW

Lower Vertical Limit

MEA

Upper Vertical Limit

195

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
Allowable DCT through uncontrolled airspac
e.AOs using this DCT should be prepared to accept a reduced service
ATC Unit

EG**ACC

Release Date

09 FEB 2023

EG50596(SUBIP → HASTY)

RAD Code

EG50596

Valid From

BOT

Valid Until

UFN

From

SUBIP

To

HASTY

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

No

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To prevent incorrect flight planning through ALESO/KUNAV/RATUK/SOSUR
ATC Unit

EG**ACC

EG50597(SUBIP → SFD)

RAD Code

EG50597

Valid From

BOT

Valid Until

UFN

From

SUBIP

To

SFD

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

No

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To prevent incorrect flight planning through ALESO/KUNAV/RATUK/SOSUR
ATC Unit

EG**ACC

EG50598(WAFIL → OSBON)

RAD Code

EG50598

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

WAFIL

To

OSBON

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

EG50599(WAFIL → PEMOS)

RAD Code

EG50599

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

WAFIL

To

PEMOS

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙