RAD restriction EG5061

Explain
Candidate screen (advisory)
Search Results (10 found)
RAD V1.6
(Annex 3B DCT) En-route DCT Options (10 found)

EG5061(BAMLI → ELBOB)

RAD Code

EG5061

Valid From

BOT

Valid Until

UFN

From

BAMLI

To

ELBOB

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To enable city pair traffic operating between EIDW-EIDL-EIDW where no air route exists
ATC Unit

EG**ACC

EG50610(TIR → BRUCE)

RAD Code

EG50610

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

TIR

To

BRUCE

Lower Vertical Limit

105

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To enable flight planning above N958D.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50611(TIR → GINGA)

RAD Code

EG50611

Valid From

BOT

Valid Until

UFN

From

TIR

To

GINGA

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To allow expeditious routing outside controlled airspace where traffic levels do not warrant a permanent air route.
ATC Unit

EG**ACC

EG50613(TLA → AMLAD)

RAD Code

EG50613

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

TLA

To

AMLAD

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

EG50614(TLA → APSOV)

RAD Code

EG50614

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

TLA

To

APSOV

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

EG50615(TLA → GOMUP)

RAD Code

EG50615

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

TLA

To

GOMUP

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

EG50616(TLA → IBROD)

RAD Code

EG50616

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

TLA

To

IBROD

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

EG50617(TLA → MIMKU)

RAD Code

EG50617

Valid From

2209 [08 SEP 2022]

Valid Until

UFN

From

TLA

To

MIMKU

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
To reflect operational procedures and ensure correct FDP.
ATC Unit

EG**ACC

Release Date

17 JUL 2022

EG50618(TLA → FOYLE)

RAD Code

EG50618

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

TLA

To

FOYLE

Lower Vertical Limit

MEA

Upper Vertical Limit

255

Available or Not

Yes

Utilization
TBD
- General conditions apply
Time Availability

00:00-23:59

Operational Goal
Provides connectivity with N560 for traffic to L602 and N601.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50619(TLA → TRN)

RAD Code

EG50619

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

TLA

To

TRN

Lower Vertical Limit

105

Upper Vertical Limit

255

Available or Not

Yes

Utilization
COMPULSORY FOR TFC
eng-type Turboprop, Piston
DEP EGPH
1.Via NIMAT
2.ARR BELFAST_GROUP
Time Availability

00:00-23:59

Operational Goal
TLA DCT TRN provides connectivity for EGPH Propeller outbounds onto P600, EGPK/AC/AA inbounds from L602 and P600 for EGNT departures
ATC Unit

EG**ACC

Release Date

29 OCT 2021

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙