RAD restriction EG5087

Explain
Candidate screen (advisory)
Search Results (10 found)
RAD V1.6
(Annex 3B DCT) En-route DCT Options (10 found)

EG5087(RIVOT → ALOTI)

RAD Code

EG5087

Valid From

2604 [16 APR 2026]

Valid Until

UFN

From

RIVOT

To

ALOTI

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
COMPULSORY FOR TFC
1.DEP EGNT AND-THEN ARR (ENBR, ENZV)
EXC
a.VIA (GOMOT DCT CUTEL) & BTN FL105-FL255 AT (GOMOT DCT CUTEL)
b.ABV FL245 IN (EG, EN)
Time Availability

(EGD613D & EGD613DZ1 & EGD613DZ2 & EGD514 & EGD514Z1) NOT ACT

Operational Goal
1.To enable low level traffic to file across North Sea when there is no activity promulgated in the AUP/UUP for any of the listed danger areas.
2.TFC SHALL FILE NATEB DCT ROBEM DCT RIVOT DCT ALOTI
3.TFC OUTSIDE THESE HOURS SHALL FILE
a.via NATEB DCT CUTEL DCT NIVUN (CHECK EGD513 ACTIVITY)
b.GOMOT DCT CUTEL
ATC Unit

EG**ACC

Release Date

11 MAR 2026

EG50870(MCT → DOLAS)

RAD Code

EG50870

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

MCT

To

DOLAS

Lower Vertical Limit

MEA

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
Via NAVPI
Time Availability

00:00-23:59

Operational Goal
To enable standard routeings.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50871(MCT → TNT)

RAD Code

EG50871

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

MCT

To

TNT

Lower Vertical Limit

MEA

Upper Vertical Limit

195

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
Via NAVPI
Time Availability

00:00-23:59

Operational Goal
To enable standard routeings.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50872(MID → DET)

RAD Code

EG50872

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

MID

To

DET

Lower Vertical Limit

105

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
ARR EGSG
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50873(MID → HOLLY)

RAD Code

EG50873

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

MID

To

HOLLY

Lower Vertical Limit

105

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
ARR EGKR
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50874(MID → PEPIS)

RAD Code

EG50874

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

MID

To

PEPIS

Lower Vertical Limit

105

Upper Vertical Limit

125

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
ARR EGLM
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50875(NELSA → GOKOV)

RAD Code

EG50875

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

NELSA

To

GOKOV

Lower Vertical Limit

105

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
DEP EGNM
WITH ARR EGNT
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50876(NEVIL → DRAKE)

RAD Code

EG50876

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

NEVIL

To

DRAKE

Lower Vertical Limit

105

Upper Vertical Limit

215

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
ARR EGKA
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50877(NIGIT → MID)

RAD Code

EG50877

Valid From

2112 [02 DEC 2021]

Valid Until

UFN

From

NIGIT

To

MID

Lower Vertical Limit

105

Upper Vertical Limit

245

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
ARR EGKR
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

29 OCT 2021

EG50878(NIGIT → OCK)

RAD Code

EG50878

Valid From

2303 [23 MAR 2023]

Valid Until

UFN

From

NIGIT

To

OCK

Lower Vertical Limit

065

Upper Vertical Limit

145

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
acft-eqpt NOT (D1, D2, D3, D4, O1, O2, O3, O4)
ARR (EGLD, EGLL, EGWU)
Time Availability

00:00-23:59

Operational Goal
To enable standard routeing.
ATC Unit

EG**ACC

Release Date

09 FEB 2023

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙