RAD restriction EP5520

Explain
Candidate screen (advisory)
Search Results (1 found)
RAD V1.6
(Annex 3A DEP) Aerodrome Connectivity Options (1 found)

EP5520(EPSC)

RAD Code

EP5520

Valid From

2412 [28 NOV 2024]

Valid Until

UFN

DEP AD

EPSC

DCT Dep PT

(GOMEX, IRGET, PESEL, VAVUN)

DEP FPL Options
ONLY AVBL FOR TFC
RFL BLW FL95 IN EP
DEP Time Applicability

00:00-23:59

DEP Operational Goal
To allow connections for EPSC departures for GA.
DEP Remarks
Traffic with RFL above FL95 should be planned via last point of SID procedures.
NAS/FAB

EP

Release Date

21 OCT 2024

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙