RAD restriction LF5104

Explain
Candidate screen (advisory)
Search Results (2 found)
RAD V1.6
(Annex 2B) Local and Cross-border Capacity and Structural Rules (1 found)

LF2720

RAD Code

LF2720

Valid From

2512 [27 NOV 2025]

Valid Until

UFN

Point or Airspace

IBNIT

Time Applicability

1. a. H24 1. b. 22:00-04:30 (21:00-03:30)

Categorisation

S

Utilization
NOT AVBL FOR TFC
1.VIA IBNIT AND-THEN VIA LFFRASE EXC
a.VIA (IBNIT DCT LESPI) & (BLW FL245 IN LFMMCTA)
i)VIA (LESPI A3 AMIKO) & ARR LFLU
ii)VIA (LESPI DCT BELEP DCT MEBAK) & ARR (LFLG, LFLJ, LFHM, LFKA)
b.VIA (IBNIT DCT ROLIR DCT AMFOU) & ABV FL245 AT (IBNIT DCT ROLIR) & DEP PARIS_GROUP & ARR LFMN
Operational Goal
LFMM FRA - Flow organization
Remarks
ROLIR DCT AMFOU: FL125 - FL500
(Annex 3B: LF5104)
ATC Unit

LFMMACC

NAS/FAB

LF

Release Date

20 OCT 2025

(Annex 3B DCT) En-route DCT Options (1 found)

LF5104(ROLIR → AMFOU)

RAD Code

LF5104

Valid From

2512 [27 NOV 2025]

Valid Until

UFN

From

ROLIR

To

AMFOU

Lower Vertical Limit

FL125

Upper Vertical Limit

FL500

Available or Not

Yes

Utilization
ONLY AVBL FOR TFC
VIA (IBNIT DCT ROLIR) & ABV FL245 AT (IBNIT DCT ROLIR)
Direction of Cruising Levels

Odd

Time Availability

00:00-23:59

Operational Goal
Night time fuel saving route (NTFSR)
Time limits in LF2720
Remarks
FRAF
ATC Unit

LFMMACC

Release Date

20 OCT 2025

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙