RAD restriction LS2825

Explain
Candidate screen (advisory)
Search Results (1 found)
RAD V1.6
(Annex 2B) Local and Cross-border Capacity and Structural Rules (1 found)

LS2825

RAD Code

LS2825

Valid From

19 MAR 2025 [2502]

Valid Until

UFN

Point or Airspace

BASGO

Time Applicability

00:00-23:59

Categorisation

S

Utilization
NOT AVBL FOR TFC
VIA LSASFRA EXC ARR (LIMC, LIMF, LIMZ)
Operational Goal
To create structural limitations to manage the traffic flows within FRA skyguide so that capacity, complexity and safety can be maintained.
Remarks
LSASFRA
ATC Unit

(LSAZACC, LSAGACC)

NAS/FAB

LS

Release Date

18 MAR 2025

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙