RAD restriction LTLG1001

Explain
Candidate screen (advisory)
Search Results (2 found)
RAD V1.6
(Annex 2B) Local and Cross-border Capacity and Structural Rules (2 found)

LG2029

RAD Code

LG2029

Valid From

2606 [11 JUN 2026]

Valid Until

UFN

Point or Airspace

VEXOL

Time Applicability

1. AIRAC MAR - LAST AIRAC OCT 04:00-21:00 2. AIRAC MAR - LAST AIRAC OCT 04:00-21:00 3. H24 4. AIRAC MAR - LAST AIRAC OCT H24 5. H24 ---------- AIRAC MAR - LAST AIRAC OCT H24

Categorisation

S

Utilization
NOT AVBL FOR TFC
1.ARR (E***, L***) & XNG LG - LT BDRY EXC
a.ARR LT**
b.FLT-TYPE (M)
2.DEP (E***,L***) & XNG LT - LG BDRY EXC
a.DEP LT**
b.FLT-TYPE (M)
3.VIA VEXOL & VIA (LA, LI, LM) EXC
FLT-TYPE (M)
4.ARR LG** EXC
a.ARR (LGAV, LGBL, LGHI, LGKF, LGKL, LGKR, LGLM, LGLR, LGMT, LGRX, LGSK, LGZA)
b.FLT-TYPE (M)
c.DEP LTBJ & ARR LGTS
5.VIA VEXOL & VIA (DISOR, RUGAS)
----------
NOT AVBL FOR TFC
1.ARR/DEP (LTFE, LTBS, LTAI)
Operational Goal
1,2.To de-conflict with a major traffic flow.
ARR LTBJ not allowed via VEXOL see RS LTLG1001
3.Traffic to route via pts: REDRA/NEMOH instead, to avoid multiple sectors' clipping/remain on major traffic flow and avoid conflicts with adjacent sectors' flows.
4.Traffic allowed to enter via VEXOL, to opt instead for GOLDO when ARR LG N/NE ames, and for REDRA when ARR LG S/SE ames, in order to avoid multiple sectors' clipping.
5.To force traffic via dedicated routes/points.
Traffic to route via pt NEMOH instead, to remain on major traffic flow and avoid conflicts with adjacent sectors' flows.
NAS/FAB

LG

Release Date

09 JUN 2026

LTLG1001

RAD Code

LTLG1001

Valid From

25 OCT 2024 [2410]

Valid Until

UFN

Point or Airspace

VEXOL

Time Applicability

00:00-23:59

Categorisation

C

Utilization
NOT AVBL FOR TFC
ARR LTBJ EXC DEP LGAV AND-THEN ARR LTBJ
Operational Goal
To segregate arrival and departure flows to/from LTBJ organising unidirectional flows and increasing capacity in relevant ATC sectors.
Traffic shall file via RIKSO during night, weekend and holidays as stated in AIP.
ATC Unit

LTAAACC

NAS/FAB

LT,LG

Release Date

25 OCT 2024

Advisory only. This screens your route against restrictions we could structurally parse — it can never tell you a route is clean. IFPS validation is the only authoritative check.

Get in touch with us

Subscribe to receive updates about new features and improvements.

Contact Information

Feel free to reach out with any questions or feedback.


© 2026 RAD Restrictions. All rights reserved. By subscribing, you agree to receive updates from RAD Restrictions.
An unhandled error has occurred. Reload 🗙